Queueing Model Improves IBM's Semiconductor Capacity and Lead-Time Management, Interfaces, vol.40, issue.5, pp.397-407, 2010. ,
DOI : 10.1287/inte.1100.0516
Priority mix planning for cycle time-differentiated semiconductor manufacturing services, 2008 Winter Simulation Conference, pp.2251-2259, 2008. ,
DOI : 10.1109/WSC.2008.4736327
URL : http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.641.550
The Development of the Complete X-Factor Contribution Measurement for Improving Cycle Time and Cycle Time Variability, IEEE Transactions on Semiconductor Manufacturing, vol.19, issue.3, pp.352-362, 2006. ,
DOI : 10.1109/TSM.2006.879408
Aggregate modeling of semiconductor equipment using effective process times, Proceedings of the 2011 Winter Simulation Conference (WSC), pp.1795-1807, 2011. ,
DOI : 10.1109/WSC.2011.6147894
The impact of simultaneous continuous improvement in setup time and repair time on manufacturing cycle times under uncertain conditions, International Journal of Production Research, vol.30, issue.2, pp.447-464, 2013. ,
DOI : 10.1108/01445151011029754
Approximations for the mean queue length of the queue, Operations Research Letters, vol.34, issue.2, pp.205-213, 2006. ,
DOI : 10.1016/j.orl.2005.01.011
Factory Physics: Foundations of Manufacturing Management, 2001. ,
A Diagnostic Tree for Improving Production Line Performance, Production and Operations Management, vol.9, issue.2, pp.77-92, 2007. ,
DOI : 10.1093/acprof:oso/9780195126167.001.0001
URL : http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.530.105
Analytic approximations for multiserver batch-service workstations with multiple process recipes in semiconductor wafer fabrication, IEEE Transactions on Semiconductor Manufacturing, vol.14, issue.4, pp.395-405, 2001. ,
DOI : 10.1109/66.964327
Cycle time reduction via machine-to-operation qualification, International Journal of Production Research, vol.47, issue.24, pp.6899-6906, 2009. ,
DOI : 10.1109/6104.827525
Optimizing factory performance, 2009. ,
capacity of semiconductor fab workstations, International Journal of Production Research, vol.49, issue.17, pp.5121-5131, 2011. ,
DOI : 10.1080/00207540802452140
An Experimental Comparison of Production Planning Using Clearing Functions and Iterative Linear Programming-Simulation Algorithms, IEEE Transactions on Semiconductor Manufacturing, vol.25, issue.1, pp.104-117, 2012. ,
DOI : 10.1109/TSM.2011.2176560
Segregating Preventive Maintenance Work for Cycle Time Optimization, IEEE Transactions on Semiconductor Manufacturing, vol.26, issue.1, pp.125-131, 2013. ,
DOI : 10.1109/TSM.2012.2234152
Coordinating Strategic Capacity Planning in the Semiconductor Industry, Operations Research, vol.51, issue.6, pp.839-849, 2003. ,
DOI : 10.1287/opre.51.6.839.24917
Measuring cycle time through the use of the queuing theory formula (G/G/m), Proceedings of the Winter Simulation Conference 2014, pp.2414-2421, 2014. ,
DOI : 10.1109/WSC.2014.7020085
The Engineering Management of Speed, Proceedings of the 2012 Industry Studies Association Annual Conference, 2012. ,
Capacity and cycle time-throughput understanding system (CAC-TUS) an analysis tool to determine the components of capacity and cycle time in a semiconductor manufacturing line, 10th Annual IEEE/SEMI. Advanced Semiconductor Manufacturing Conference and Workshop. ASMC 99 Proceedings (Cat. No.99CH36295), pp.127-131, 1999. ,
DOI : 10.1109/ASMC.1999.798198
A step toward capacity planning at finite capacity in semiconductor manufacturing, Proceedings of the Winter Simulation Conference 2014, pp.2239-2250, 2014. ,
DOI : 10.1109/WSC.2014.7020067
URL : https://hal.archives-ouvertes.fr/hal-01194492
A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations, Journal of Scheduling, vol.167, issue.1, pp.583-599, 2011. ,
DOI : 10.1016/j.ejor.2004.03.027
Cycle Time Approximations for the G/G/m Queue Subject to Server Failures and Cycle Time Offsets with Applications, The 17th Annual SEMI/IEEE ASMC 2006 Conference, pp.322-326, 2006. ,
DOI : 10.1109/ASMC.2006.1638777
Practical Extensions to Cycle Time Approximations for the <formula formulatype="inline"><tex>$G/G/m$</tex></formula>-Queue With Applications, IEEE Transactions on Automation Science and Engineering, vol.4, issue.4, pp.523-532, 2007. ,
DOI : 10.1109/TASE.2007.905975
Capacity Loss Factors in Semiconductor Manufacturing Working paper, 2003. ,
On the Validity of Approximation Formulae for Machine Downtimes, Research Report Series, 2000. ,
Qualification management to reduce workload variability in semiconductor manufacturing, Proceedings of the Winter Simulation Conference 2014, pp.2434-2443, 2014. ,
DOI : 10.1109/WSC.2014.7020087
Estimating Wafer Processing Cycle Time Using An Improved, Proceedings of the 2013 Winter Simulation Conference, pp.3789-3795, 2013. ,
DOI : 10.1109/wsc.2013.6721738
URL : http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.652.6685
Queue mining for delay prediction in multi-class service processes, Information Systems, vol.53, pp.278-295, 2015. ,
DOI : 10.1016/j.is.2015.03.010
Queueing Theory for Semiconductor Manufacturing Systems: A Survey and Open Problems, IEEE Transactions on Automation Science and Engineering, vol.4, issue.4, pp.513-522, 2007. ,
DOI : 10.1109/TASE.2007.906348
The effectiveness of variability reduction in decreasing wafer fabrication cycle time, 2013 Winter Simulations Conference (WSC), pp.3796-3805, 2013. ,
DOI : 10.1109/WSC.2013.6721739
Approximations for the, pp.114-161, 1993. ,
An Examination of Variability and Its Basic Properties for a Factory, IEEE Transactions on Semiconductor Manufacturing, vol.18, issue.1, pp.214-221, 2005. ,
DOI : 10.1109/TSM.2004.840525
The Determination and Indetermination of Service Times in Manufacturing Systems, IEEE Transactions on Semiconductor Manufacturing, vol.21, issue.1, pp.72-82, 2008. ,
DOI : 10.1109/TSM.2007.914334
A queueing network based system to model capacity and cycle time for semiconductor fabrication, 2008 Winter Simulation Conference, 2008. ,
DOI : 10.1109/WSC.2008.4736303